Project Overview

Marcus Construction designed and built this new 10,570 ton bulk dry fertilizer facility on an existing Ag Plus site that offers liquid chemical and anhydrous ammonia. This is a beautiful dry storage building with many features including: 400 tph truck and rail receiving, a 200-ton blend tower, an attached two-lane enclosed loadout building, an elevated control room over their MCC room, infloor heat, impregnation room and much more.

Facility Size
10,570 tons dry fertilizer
Construction Type
New Construction
Delivery Method
Design-Build