Project Overview

This was a greenfield site where Marcus handled all the design, civil, geotechnical, stone columns for soil improvement, site work, site engineering, and electrical through construction. Helena’s dry fertilizer facility has an elevated control room and a two lane enclosed loadout. The declining weight blending system and loadout is set three feet lower than rest of the building, easing the workload on the loader without putting a pit in the floor and making maintenance easier. The alley way stays clean and safe with infloor radiant heat.

Facility Size
10,100 tons dry fertilizer
Construction Type
Greenfield Site
Delivery Method
Design-Build