Project Overview

As the turn-key general contractor, Marcus procured and coordinated the complete project team for a greenfield site and design built a dry fertilizer shed and a pre-engineered metal warehouse. The dry fertilizer storage facility is a 7,722-ton expandable facility with truck and rail receiving, Ranco declining weight, two covered loadout lanes with two 30-ton overhead tanks on weigh scales, 9 macro bins, 3 micro bins and an area designed in the alley to store additional bags. The pre-engineered metal warehouse Marcus designed is a 21,845 sq. ft. building that supports multiple business functions for Monte Vista. Within this building they have packaged and bulk crop protection products, an agronomy shop, an energy shop, and an attached office.

Facility Size
7,722 tons dry fertilizer storage, 21,845 sq. ft. crop protection warehouse
Construction Type
Greenfield Site
Delivery Method
General Contractor