Project Overview

This is a river port distribution terminal. Marcus Construction has had the opportunity to build several times at this location including a 20,000 ton initial bulk dry fertilizer building, a 10,000 ton addition to it, and a 30,000 ton second dry fertilizer storage building that includes blending capabilities.

Facility Size
60,000 tons dry fertilizer
Construction Type
Greenfield Site
Delivery Method
Design-Build