Project Overview

The YMCA expansion on their existing facility included a wellness area, an exercise area, two racquetball courts and a multipurpose gym. Marcus provided value engineering on this project to maximize their square footage, optimize the layout, and adjust the design to get the project within budget and owner requirements. Safety management was also crucial being an operational facility with a lot of kids in and around the building.

Facility Size
14,000 sq. ft.
Construction Type
Addition
Delivery Method
General Contractor