Project Overview

Marcus Construction designed and constructed this pre-engineered steel chemical storage building. The building has two drive-thru lanes with a raised control room between the lanes, has secondary chemical containment and is completely insulated. From the pre-planning stages, through design and construction this project moved rapidly and was completed in a seven month timeframe.

Facility Size
100' x 120' chemical warehouse
Construction Type
New Construction
Delivery Method
Design-Build